GI conveyance pipes 150mm diameter in Msuwa scheme
Construction of Nkhafi scheme dam
Construction of masonry river protection works at Ukanga scheme
Ukanga scheme river protection works
PVC conveyance pipe 400mm diameter in Lisungwi scheme,
400mm diameter with straps anchored in masonry columns, Lisungwi scheme
GI pipes 400mm diameter in Lisungwi scheme
Gabions protection works on River downstream of intake structure, Lisungwi
Intake weir with steel gates and outlet steel pipe to irrigate the scheme